1.What raw materials can this production line process besides strawberries?
This line is mainly designed for strawberry jam, but it can also adapt to processing other soft fruits (such as blueberries, raspberries) into jam, with minor adjustments to process parameters.
2.What is the daily production capacity of this production line?
The specific capacity depends on the configuration, and the common models can achieve 500kg to 5 tons of finished jam per day. Customized capacity can be provided according to business needs.
3.How long does it take to install and commission the production line?
Generally, it takes 7-15 working days to complete on-site installation and commissioning (excluding transportation time), and our technicians will provide operation training during this period.
4.Does the equipment need special maintenance?
Routine maintenance mainly includes daily cleaning of equipment surfaces and pipelines, regular replacement of wearing parts (such as seals), and monthly inspection of electrical systems. We will provide a detailed maintenance manual.
5.Does the production line meet food safety certification standards?
Yes, all components are made of food-grade stainless steel, and the entire line complies with international food safety standards (such as FDA, CE), which can meet the certification requirements of most regions.